In February we installed a 2.4m turbine built by Nottingham Engineers without Borders on an existing tower and grid tied electrical system at High Leas Farm in Derbyshire to replace the 3.6m turbine which has been reconditioned and installed at the Ecological Land Co-op in Devon.
The students learnt how to assemble the turbine and get it ready for installation, how to tension guy ropes and use a winch and about grid tied electrical systems!